Journal
/
/
Operation of a 25 KWth Calcium Looping Pilot-plant with High Oxygen Concentrations in the Calciner
Journal JoVE
Environnement
Un abonnement à JoVE est nécessaire pour voir ce contenu.  Connectez-vous ou commencez votre essai gratuit.
Journal JoVE Environnement
Operation of a 25 KWth Calcium Looping Pilot-plant with High Oxygen Concentrations in the Calciner

Operation of a 25 KWth Calcium Looping Pilot-plant with High Oxygen Concentrations in the Calciner

7,719 Views

06:34 min

October 25, 2017

DOI:

06:34 min
October 25, 2017

1 Views
, , ,

Summary

Automatically generated

This manuscript describes a procedure for operating a calcium looping pilot-plant for post-combustion carbon capture with high oxygen concentrations in the calciner in order to reduce or eliminate the flue gas recycle.

Read Article